The automatic update of the charts that is performed when data are modified can be released by calling the method 
IlvChartGraphic::reDrawWhenNotified with 
IlvFalse as a parameter. In this a case, the redrawing will have to be performed manually by calling the 
IlvChartGraphic::updateAndReDraw method. 
Copyright © 2015, Rogue Wave Software, Inc. All Rights Reserved.