The automatic update of the charts that is performed when data are modified can be released by calling the method
IlvChartGraphic::reDrawWhenNotified with
IlvFalse as a parameter. In this a case, the redrawing will have to be performed manually by calling the
IlvChartGraphic::updateAndReDraw method.
Copyright © 2013, Rogue Wave Software, Inc. All Rights Reserved.