Manual test run field codes

A field code is a variable that is replaced with a specific field value. You can use the following field codes for manual test run fields.

Field Field code
Actual Hours %ACTHR%
Automated Test %TRAUT%
Changes %CHNG%
Changes with Differences (HTML) %CHNGHTML%
Closed By %TRCSD%
Closed Date %TRCDT%
Completion Status %TRCST%
Created By %TRCBY%
Creation Method %TRLOC%
Currently Assigned By %TRABY%
Currently Assigned Date %TRADT%
Currently Assigned To %TRATO%
Date Created %TRDTC%
Date Entered State %DTENS%
Date Modified %TRDTM%
Estimated Hours %ESTHR%
Estimated Run Time %TREST%
Folder Paths %FOLDER_PATHS%
Folders %FOLDS%
Has Broken Links %TRHBL%
Has Calculation Error %CLCER%
Has Emails %HEML%
Has File Attachments %TRFIL%
Has Jira Issues %HAS_EXT_ITEMS_3001%
Has Links %TRHLK%
Has Run Results %TRRES%
Has Scripts %TRSCR%
Has Source Control Files %TRSCC%
HTTP Hyperlink %HTTPURL%
Is Child in Link %TRICL%
Is Locked %VLOCK%
Is Marked As Suspect %SUSPT%
Is Parent In Link %TRIPL%
Jira Issues %EXT_ITEMS_3001%
Last Modified By %TRLST%
Link IDs %LNKID%
Linked Issues %LNKISSUES%
Linked Items %LNKITEMS%
<link definition> Linked Items %LNKITEMS_LNK<link definition record ID> (e.g., %LNKITEMS_LNK1%)
Linked Requirement Documents %LNKDOCUMENTS%
Linked Requirements %LNKREQUIREMENTS%
Linked Test Cases %LNKTESTCASES%
Linked Manual Test Runs %LNKTESTRUNS%
Number of Broken Links %BKLNK%
Number of Links %NMLNK%
Percent Done %PERDN%
Problem Statement %TRPST%
Project Name (from Project Options) %PRNM%
Project Name %PROJNAME%
Remaining Hours %REMHR%
Run Result Status %TRRST%
Source Control Files %SRCFILE%
Source Control Files (condensed) %SRCFILECON%
State Attribute %TRSTA%
Status %TRSTS%
Steps %TRSTP%
Story Points %STPTS%
Summary %TRSUM%
Test Case Number %TRTCN%
Manual Test Run Number %TRNUM%
Manual Test Run Set %TRSET%
Test Variants %TRCOV%
TTStudio Hyperlink %TTSTUDIOURL%
Type %TRTYP%
Variance %VRANC%
View Mode %TRVWMD%